Start to finish prep and pour for the 32×24 garage pad. The pad is 4″ thick with 2 6″ lift footings, 32 MPA and 12″ on center 10mm rebar. There’s a 6 inch curb above the pad and a 12″x18″ thickened edge around the perimeter of the pad structure.
Chapters
00:00 Base and form prep
03:52 Cement pump set up
05:12 Pour
08:30 Specification review