Finishing the building and starting to get the rock on the pathways. The trucking company that was bringing my rock originally showed up today and hauled me 20 loads of base rock. With the help of William Harris we finished the pad and got it rolled in. I believe it took 18 loads of rock total. 5 loads of 3″ base and 13 loads of 1″ base rock. Also had to use the loader to pull a dump truck that was stuck in the soft ground so they ended up dumping the rest of the rock on the parking lot. I cut out 7 seven pathways to the different attractions and spread rock and rolled them in. I believe they are going to chip n seal or asphalt them in the spring. This project has been a lot of fun and it’s getting one step closer everyday. Thanks for watching! #EliteEarthworks #Takeuchi #DiamondGrove